GeoHex KB DSS
Home
Experimental Support
ORC Block
Thermodynamic Module
ORC Financial Tool
ORC Block Module
Thermodynamic Module
ORC Financial Tool
Scenario
Heat exchnager information
Power plant
Economic parameters
Permitting parameters
Exploration parameters
Drilling parameters
Reservoir parameters
Geofluid gathering
Operation and maintenance
Result: Levelised Cost of Energy
Result: NPV, PP, IRR, ROI
*
indicates a required field
How are surface equipment costs determined?
Fixed Cost
Calculated
Average distance from well to plant
ft
meter
Maximum pressure drop in Surface Piping
psi
bar
Enter surface equipment costs to be used
€/well
Pump & Driver Efficiency for Production and Injection Pump
%
Are Production Wells pumped?
Yes
No
Excess Pressure at pump Suction and/or well head
psi
bar
Diameter of production pump casing
inch
cm
Production Pump setting depth
meter
Work over Rig
€/day
Installation Cost
€/m
Casing Cost
€/m
Installed Production Pump Cost
€/Well
Surface Equipment ΔP for binary conversion system
psi
bar
Excess Pressure in Injection Well
psi
bar
Installed Injection Pump Cost
total
Other Costs (% of GF Gathering System & Pump Costs)
%
BACK
Next