GeoHex KB DSS
Home
Experimental Support
ORC Block
Thermodynamic Module
ORC Financial Tool
ORC Block Module
Thermodynamic Module
ORC Financial Tool
Scenario
Heat exchnager information
Power plant
Economic parameters
Permitting parameters
Exploration parameters
Drilling parameters
Reservoir parameters
Geofluid gathering
Operation and maintenance
Result: Levelised Cost of Energy
Result: NPV, PP, IRR, ROI
*
indicates a required field
Are transmission line costs to be included?
Yes
No
Length Transmission Line
km
mile
Transmission Line Cost
€/km
$/mile
Indirect Plant Construction Costs (Fraction of Direct Construction Costs) for both plant types
%
Number of Binary Modular Units Used to Meet Specified Sales
Performance Metric - net power per unit brine flow
Direct Construction Multiplier Binary
Air Cooled Binary Power Plant Cost
€/kW
Design Wet Bulb temperature
F
C
NCG content
ppm
Hydrogen sulfide content
ppm
BACK
Next